Laserfiche WebLink
B 1 <br /> MONITORING WELL INSTALLATION SHEET <br /> 1030-001 CLIENT : CO= CORPOMTION <br /> Ind-1 N0. P- DRILLING CQNTRACTORCUstCn Auvex' Drilling <br /> ETER : --- -- <br /> Schwartzwalder Mine Vladimir Straskraba and <br /> ftQN: FIELD ENGINEER <br /> • a r <br /> OF INSTALLATION: 11-I2-81 DRILLING .SYSTEM:_ Auzer' <br /> DEPTH: 25.51. DRILLING TOOLS : Augerr 411 <br /> METER TYPE: OPT Well PIPE MATERIAL- PVC O.O. Sch. 4q.n. 2h" .�.� <br /> LENGTH OF.SECTIONS : 20� <br /> THE PIPE TOP: 6592.9 , <br /> .� PVC=Cement <br /> JOINING 'METMOD: <br /> ;TION OF THE TIP: <br /> drilled <br /> PERFORATION TYPE:' <br /> 5-TIOK OF THE.GROUND SURFACE:.65M. 4 <br /> SIZE OF SLOTS: NO. OF SLOTS' <br /> R L.EVEL AT COMPLETION: PERFORATED AREA: <br /> DEPTH (FT.): <br /> ELEVATION (FT.): <br /> NON PERFORATED PIPES: FROM: + 2'S TO; 17.0' <br /> 0' <br /> Clean wafer for <br /> ttN6 OF THE HOLE: PERFORATED PIPES: FROM: 17.0 TO. 22.0 <br /> n tress <br /> GRAVEL PACK: FROM: TO, ?A-11' <br /> =CTION STEEL CASING: TYPE AND DEPTH OF SEALING.BMtMite� S <br /> 0. D.: at tm. <br /> FROM: <br /> I T0: <br /> GEO-HYDRO Consulting, Inc, <br />