Laserfiche WebLink
Voluntary—43 CFR 3809 Plan of Operations Form <br /> 13. Quality Assurance Plan:Please provide a systematic monitoring and evaluation of the various aspects of the <br /> project including,but not limited to,what is being monitored,parameters for monitoring,frequency of <br /> monitoring,who wili conduct the monitoring,monitoring equipment,etc <br /> iV ol <br /> _-or C <br /> a 4D n 1 K v 5 J"6 W �'4 h2 e <br /> �,/ I <br /> Pd i h J S c� 0 c K m e K � � `ll"/i 0 r <br /> J <br /> 14. spill Contingency Plan:Please provide the plan for handling and remediating potential spills of hazardous <br /> materials and petroleum products.(Note—The operator Is responsible for notifying the BLM authorized officer <br /> In the event of a spill and complying with state and federal regulations onspill <br /> handling,cleanup,and reporting.) <br /> I f�� <br /> _"- <br /> Page 17 of 36 <br />