My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-24_PERMIT FILE - M2019038
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019038
>
2019-10-24_PERMIT FILE - M2019038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 6:08:31 AM
Creation date
10/25/2019 12:17:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019038
IBM Index Class Name
PERMIT FILE
Doc Date
10/24/2019
Doc Name
Response to Filing Deficiencies
From
CBRG
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Voluntary—43 CFR 3809 Plan of Operations Form <br /> 16. Interim Management Plan[Pursuant to 43 CFR 3809.401(b)(5)J <br /> tnclude a plan describing the management of the project area during period of temporary closure,including periods <br /> of seasonal closure,to prevent unnecessary or undue degradation. <br /> The Interim management plan must include,where applicable,the following: <br /> a. Measures to stabilize excavations and workings; <br /> b. Measures to isolate or control toxic or deleterious materials{see also the requirements in 43 CFR <br /> 3809.420(c)(12HO)); <br /> c- Provisions for the storage or removal of equipment,supplies,and structures; <br /> d. Measures to maintain the project area In a safe and clean condition; <br /> e. Plans for monitoring site conditions during periods of non-operation; <br /> f. A schedule of anticipated periods of temporary closure during which you would implement the interim <br /> management plan,including provisions for notifying BLM and other Involved agencies of unplanned or <br /> extended temporary closures;and <br /> g. In cases of temporary or seasonal dosure,you must provide adequate maintenance,monitoring,security, <br /> and financial guarantee,and BLM may require you to detoxification of process solutions. <br /> frr-&-�. p <br /> Page 19 of 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.