Laserfiche WebLink
Voluntary—43 CFR 3809 Plan of Operations Form <br /> d. Describe the estimated topsoil depth and how topsoil will be sahraged,stockpiled,managed during operations, <br /> and redistributed for the re-establishment of vegetation at final mdamation.Specify approximate redistribution <br /> depth. <br /> 7-G;D 6 , W A .5 5, -"'r D e-� "I YL I Q V d 5 — 5�a}5 (� <br /> To P S d� � i 5 !d 5 f �{ jc� Q � �►�d 15 �0.51t L C(}`�C <br /> n o `2 re <br /> "-7 <br /> 111 b-e <br /> e. Describe how portals,adits,shafts,ponds,excavation,drip holes or other disturbances will be reclaimed <br /> (refer to the State of Colorado for speck reclamation performance standards that may apply).The removal/ <br /> stabilization of buildings,structures and facilities should be addressed,as applicable.You maywtsh to <br /> contact other State and Federal Agencies for closure specifications.indicate if there are any facilities,roads, <br /> ponds,etc to be left after final reclamation.The location of these features should be noted in Exhibit VI. <br /> L-. K CciO4.T10vi5 Will &e. Fill -ec4 J- 51619,9 q—( 61'.3- <br /> c� vL cQ S e/'e 4'e_'f wig e�cl .�4A"3 <br /> d C nko 101 �r ah <br /> �aar� iS (na5 (�� e� J k 'ekis{aI%-C-e S, ice 1 � v <br /> f. Describe any reclamation that is necessary because of in-stream mining. <br /> No -t Ap r <br /> g. Toxic and Deleterious Materials,as applicable NQ A,of) <br /> i. Provide the methods for reclaiming any waste rock,ore,and !other stock piles(including original <br /> underlying topography,operational slope,and proposed reclaimed slope). <br /> /V 4 <br /> Page 23 of 36 <br />