Laserfiche WebLink
Voluntary—43 CFR 3809 Plan of Operations Form <br /> EMBIT X11 <br /> Reclamation Costs[Pursuant to 43 CFR 38M.5521 <br /> Ibfs EehibitnW be applied to CORMS F/ardrock 212 EAMI t,addJtionol tnformaUm moy be required <br /> AddWonallnformotk n andlarmktyaUon may belnduded In thecarmspondhrp NEPA analystsfarthe proposed project <br /> The reclamation cost estimate must ensure: <br /> 1.the estimated costs as If Bt.M/CDRMS were to contract with a third party to reclaim the operations according <br /> to the reclamation plan,including construction and maintenance costs for any treatment facilities necessary to <br /> meet Federal and State environmental standards. <br /> 2.The Cost of Equipment Rental,Operation and labor Appropriate for the Geographic Area,or, <br /> Enter those values in the cost estimate that are appropriate to this project Attach sources/information used in cost <br /> estimate(examples:Caterpillar Performance Handbook,wntractor's estimate,etc.). <br /> Exploration Roads&Drill Pads NA <br /> Roads tM <br /> Drill Hole Abandonment NA <br /> Pits AM <br /> Underground Openinp AM <br /> Process Ponds IVA <br /> Waste Rock Dumps ' — + — f�- O <br /> Tailings A <br /> Foundation&Build Area AJA <br /> Lay down/storage yards,Etc <br /> Drainage&Sediment Control ro <br /> Other <br /> -Mobilization/Demobilization 11/ <br /> subtotal"A" -7 DO <br /> ° _ <br /> Exploration j✓ $ $ $ $ <br /> Exploration Roads&Drill Pads <br /> Roads NIA <br /> Didl Hole Abandonment <br /> Pits <br /> Underground Openings <br /> Process Ponds MIA <br /> Heaps o <br /> Waste Rock Dumps N A <br /> Tailings <br /> Page 32 of 36 <br />