My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-23_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2019-10-23_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 4:30:12 AM
Creation date
10/24/2019 9:47:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
10/23/2019
Doc Name
Adequacy Review
From
BLM
To
DRMS
Type & Sequence
SL1
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . ~= United States Department of the Interior <br /> BUREAU 01� LAND AN GI:MENT <br /> UNCO 'PAI-1 IRE HUD OFFICE <br /> CHI 3 2465 South Townsend <br /> Montrose,CO 81401 <br /> www.blnl.gov/co/st/en/fo/ufo.htm] <br /> In Reply <br /> Refer to: COS05000, 3400 <br /> Christine Belka <br /> Senior Regulatory Program CCT Specialist 1 r 2 3 3 >> > <br /> �019 <br /> USDOI Office of Surface Mining <br /> Denver Field Division <br /> 1999 Broadway, Suite 3320 <br /> Denver, CO 80202 <br /> RE: Proposed Decision of the Colorado Division of Reclamation, Mining and Safety <br /> (CDRMS) SL-1 Partial Phase I Bond Release at the Elk Creek Mine, PN C-1981-022 <br /> Dear Ms. Belka: <br /> This is to inform you that my staff has reviewed the CDRMS Inspection Report dated May 30, <br /> 2019 and the OSM Mine Site Inspection Report dated May 31, 2019. We note that both <br /> CDRMS and OSM acknowledge that Oxbow achieved demolition and removal of structures <br /> followed by completed backfilling and grading that included reconstruction of the Elk Creek <br /> channel. We also note that the original bond release acres were reduced from 20.60 to 19.40 to <br /> remove the channel corridor due to the probability of future stability issues. <br /> We have determined that the lands included in the bond release area were fee surface lands and <br /> that the reclamation removed surface facilities that served coal mined from federal mineral estate <br /> managed by the BLM. All the facilities and the related surface they occupied had served their <br /> useful purpose and were no longer necessary. The reclamation appears to be properly carried out <br /> as CDRMS and OSM reported. If the private land owner is satisfied with the reclamation <br /> completed, then the BLM has no objection to the Phase I Bond Release. <br /> If you have any questions please contact Desty Dyer at 970-240-5302. <br /> Sincerely, <br /> Greg -fir--- <br /> son <br /> Field Office Manager <br /> CC Leigh Simmons, CDRMS <br /> Dan Gray, USFS <br />
The URL can be used to link to this page
Your browser does not support the video tag.