Laserfiche WebLink
Blue Mountain Energy, Inc. - Deserado Mine <br /> Quarterly Sediment Pond Inspection Report <br /> Third Quarter 2019 <br /> Inspector: Kurtis BIunt-Sr.Environmental Engineer <br /> Orpwerational Status <br /> We of Approx Sediment Outflow H2O Samp. <br /> # Ponds Name Description Date H,0 Level% Level% Yes No Yes No Comments <br /> 1 Sed Ponds DP-1 D-Portal 9/16 100 45 X X <br /> 2 RP-1 Refuse Area 1 9/16 0 10 X X <br /> 3 RP-2/3 Refuse Area 2/3 9/16 5 15 X X <br /> 4 RP-4 Refuse Area 4 9/16 0 30 X X <br /> 5 RP-5 Refuse Area 5A 9/16 0 25 X X <br /> 6 IfRR-1 Railroad Fill Slope Pond 1 9/16 0 5 X X <br /> 7 " RRS Railroad Loadout Washdown Sump 9/16 0 5 X X <br /> 8 SS-1 Slot Storage Building Access Road Pond 9/16 0 10 X X <br /> 9 SS-2 Slot Storage Blding Emerg.Coal Storage Area Pond 9/16 0 6 X X <br /> 10 HSL-1 Halandras Sanitary Land Fill Pond 9/16 0 5 X X <br /> 11 SDH-2U Down Hole Sump Upper Influent Pond inactive inactive 5 X X Shut off 2/96 due to mine sealing <br /> 12 SDH-2L Down Hole Sump Lower Effluent Pond inactive inactive 5 X X Shut off 2/96 due to mine sealing <br /> 13 SDH-3L Down Hole Sump Discharge 2-Lower 9/16 90 10 X X Pumping restarted late November 2017 <br /> 14 SDH-3M Down Hole Sump Discharge 2-Middle 9/16 0 0 X X New 10/2015 <br /> 15 SDH-3U Down Hole Sump Discharge 2-Upper 9/16 0 0 X X New 10/2015 <br /> 16 TS-1 Transfer Building 1 9/16 0 20 X X <br /> 17 TS-2 Transfer Building 2 9/16 0 20 X X <br /> 18 TS-2a Temp Coal Storage by Transfer 2 9/16 0 5 1 X X <br /> 19 itBD-1 B-Dewatering Pond#1 9/16 90 40 X X Outflow weekly <br /> 20 ofBD-2 B-Dewatering Pond#2 9/16 95 25 X X Outflow weekly <br /> 21 ofBD-3 B-Dewatering Pond#3 9/16 95 0 X X Outflow weekly <br /> 22 BD-4 B-Dewatering Pond#4 9/16 95 0 X X Outflow weekly <br /> 23 BD-5 B-Dewatering Pond#5 9/16 95 0 X X Outflow weekly <br /> 24 BD-6 B-Dewatering Pond#6 9/16 95 0 X X Outflow weekly <br /> 25 If <br /> BD-7 B-Dewatering Pond#7 9/16 95 0 X X Outflow weekly <br /> 26 IfBD-LC B-Dewatering Last Chance Pond 9/16 95 0 X X Outflow weekly <br /> 27 BD2-3 BD2-Dewatering Pond#3(lower large pond) 9/16 20 0 X X <br /> 28 If <br /> BD2-4 BD2-Dewatering Pond#4(discharge pond) 9/16 0 0 X X <br /> 29 soBD2-5 BD2-Dewatering Pond#5(initial small pond) 9/16 0 5 X X <br /> 30 Proc Pond PP-1 Prep Plant Process Pond 9/16 40 20 X X <br /> 31 IfPP-2 Prep Plant Process Pond 9/16 20 50 X X <br /> 32 RW-1 Raw Water Lagoon @ White River 9/16 100 25 X X Freshwater storage pumped from river <br />