My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-18_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2019-10-18_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:56:25 AM
Creation date
10/23/2019 9:52:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
10/18/2019
Doc Name Note
For SL1
From
DRMS
To
Oxbow Mining, LLC
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6280 0 <br /> 0 <br /> 6270 -1 0 <br /> $ 6260 N � 2 > <br /> c 6250 -3 0 } <br /> o a) <br /> zz 6240 -4 � <br /> v 6230 -5 > v <br /> "' 6220 -6 Q <br /> 6210 7 <br /> ai <br /> 6200 -g a <br /> 0 <br /> 0 100 200 300 400 500 600 700 800 900 - <br /> Distance along channel,ft(Middle Pad) <br /> 6130 -2 <br /> 6120 -3 +� <br /> c <br /> 6110 -4 E <br /> 6100 -5 v <br /> 6090 -6 0 <br /> 6080 -7 <br /> 0 6070 -8 <br /> +� 0 <br /> 6060 -9 v <br /> v � <br /> LL, 6050 -10 <br /> v <br /> 6040 -11 a <br /> 6030 -12 0 <br /> 6020 -13 ai <br /> a <br /> 6010 -14 -0° <br /> 6000 -15 <br /> 0 200 400 600 800 1000 1200 <br /> Distance along channel,ft(Lower Pad) <br /> Figure 6: Elk Creek Channel elevation/slope profiles <br /> Summary and Conclusions <br /> Based upon a review of the mine permit,the applicant's bond release application, and site inspections, <br /> the Division finds that Oxbow Mining, LLC has completed backfilling, grading and drainage <br /> reestablishment at the Elk Creek Mine in accordance with the approved reclamation plan. <br /> The reconstructed channel was removed from the SL-1 parcels at the Division's request so as to allow <br /> time for the stability of the channel to be assessed. The channel will be observed regularly throughout <br /> the ongoing period of reclamation liability. When the long-term stability of the entire channel has been <br /> demonstrated, an update to the PAP to include as-built details of the reconstructed channel prior to an <br /> application for Phase I,II and III bond release will be required. <br /> C-1981-022,SL-1 Page 16 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.