Laserfiche WebLink
45 <br /> 40 <br /> � 35 • • <br /> M • <br /> cc <br /> 3 30 <br /> 0 • <br /> zz <br /> 25 06.19.14 pipe cleanout 05.08.18 pipe video <br /> and video (no cleanout performed) <br /> 20 <br /> r _ � V-4 <br /> V-4 N N <br /> 00 111 Date <br /> M la <br /> Figure 3. Underdrain Flow Rate <br /> 5 <br /> 2019 Dam Safety Inspection Report San Luis Tailings Dam <br />