My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-21_REVISION - M2002004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002004
>
2019-10-21_REVISION - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:12:48 PM
Creation date
10/22/2019 1:00:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
REVISION
Doc Date
10/21/2019
Doc Name
Request for Technical Revision
From
GCC Rio Grande
To
DRMS
Type & Sequence
TR7
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Title: Sampling and Analysis Plan for Environmental Control Number: Revision Date: <br /> Groundwater Monitoring PUE.EN.D.026.03 10/18/2019 Page 3 of 23 <br /> Table of Contents <br /> 1.0 Introduction and Sampling Objectives.........................................................................5 <br /> 2.0 Groundwater Sampling Locations and Frequency......................................................5 <br /> 2.1 Sampling Locations .................................................................................................6 <br /> 2.2 Monitoring Frequency .............................................................................................6 <br /> 3.0 Sampling Methods ..........................................................................................................6 <br /> 3.1 Documentation and Records ...................................................................................6 <br /> 3.2 Water Level Measurements .....................................................................................7 <br /> 3.3 Field Water Quality Measurements.........................................................................7 <br /> 3.4 Groundwater Sample Collection Procedures...........................................................7 <br /> 3.4.1 Method A for Groundwater Sample Collection ...........................................8 <br /> 3.4.2 Method B for Groundwater Sample Collection............................................9 <br /> 3.4.3 Method C for Groundwater Sample Collection............................................9 <br /> 3.5 Equipment Decontamination Procedures...............................................................10 <br /> 3.6 Sample Handling and Custody Requirements .......................................................10 <br /> 3.6.1 Sample Handling ........................................................................................11 <br /> 3.6.2 Sample Custody Documentation ................................................................11 <br /> 3.7 Field Quality Assurance/Quality Control (QA/QC) Samples................................12 <br /> 4.0 Laboratory Analysis and Analytical Parameters.......................................................12 <br /> 4.1 Laboratory Analysis...............................................................................................12 <br /> 4.2 Analytical Parameters............................................................................................12 <br /> 5.0 Data Quality, Validation and Usability ......................................................................13 <br /> 5.1 Data Quality Objectives.........................................................................................13 <br /> 5.2 Data Review, Validation and Verification Requirements......................................14 <br /> 5.2.1 Data Validation ..........................................................................................14 <br /> 5.2.2 Laboratory Data Verification......................................................................16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.