Laserfiche WebLink
TECHNICAL REVISION <br /> GCC owns and operates a cement manufacturing plant located in Pueblo. The Pueblo Plant also <br /> operates an on-site limestone quarry. The quarry operates under the Mining Permit No. M- <br /> 2002-004 issued on August 29, 2003. With this application, and due to recent changes adopted <br /> and implemented as part of Technical Revisions TR-03 and TR-06, GCC is requesting a technical <br /> revision to its 112 Permit Application submitted in 2002. Specifically, this TR requests that <br /> DRMS review for approval the attached updated and revised Sampling and Analysis Plan (SAP). <br /> The proposed SAP describes the current monitoring well network, changes incorporated by <br /> DRMS and GCC since 2003, and up-to-date sampling procedures and laboratory analytes and <br /> protocols. It is also designed to incorporate other monitoring wells as they are installed. <br />