Laserfiche WebLink
O DY <br /> MRqD <br /> EOMPANY <br /> Project Scope/Overview: <br /> Construct a soil-bentonite slurry wall around the perimeter of the NE1/4, NE1/4, Sec 28, T3N, R67W <br /> (See Figure 2. The slurry wall will be installed through alluvial sand and gravel and overburden to an <br /> average depth of 48 feet, and keyed into bedrock shale. <br /> The slurry wall will be constructed from soils present on site. Overburden used for the wall will be <br /> excavated onsite and placed along the perimeter of the wall for blending of slurry fluids and <br /> placement into the wall. <br /> 2 water infiltration basins will be built to allow re-charge of the reservoir. The basins will be <br /> excavated to an average depth of 25'. Pond One will be 121,000 cubic yards in size. Pond 2 will be <br /> 181,500 cubic yards in size. Overburden and alluvial gravel excavated from the basins will be placed <br /> in graded piles and re-vegetated. <br /> To transfer water from the reservoir, Dixie Water will install 6 water wells (see Figure 2). No other <br /> infrastructure is planned for the site. <br /> Upon completion of the slurry wall, the area will continue to be used for agricultural purposes as a <br /> dryland crop farm. <br /> Read), Mixed Concrete Company Address: 11778 Highwa} 52. Fort Lupton,Colorado 80621 Office Phone: (303)286-1983 <br />