Laserfiche WebLink
IV. PROPOSED DECISION <br /> Based on the observations above,the Division proposes to approve Oxbow Mining, LLC's <br /> request for a Partial Phase I bond release for the Elk Creek Mine. This proposed decision will <br /> release the applicant from liability for backfilling, grading, and drainage reestablishment for the <br /> land inside the parcels shown on the map accompanying the SL-1 application. <br /> Elk Creek Mine C-1981-022 <br /> Bond Release History <br /> Bond Release Acre a e <br /> Total Phase I Phase I Phase II Phase II Phase III Phase III <br /> Disturbed Released Remaining Released Remaining Released Remaining <br /> SL-1 239.2 19.4 219.8 0 239.2 0 239.2 <br /> Table 1: Bond Release History <br /> The original performance bond for the Elk Creek Mine prior to this SL-1 bond release was <br /> $4,323,977.80. For the partial Phase I portion of this SL-1 bond release, Rule 3.03.1(2)(a) states <br /> that the Division can release up to 60% of the entire amount. The 19.4 acres that are requested <br /> for Phase I bond release make up approximately 8.11% of the 239.2 total disturbed acres. <br /> $2,594,386.68 constitutes 60% of the original liability (60% of$4,323,977.80). Per Rule <br /> 3.03.1(2)(a), the Division can release up to $210,404.76 (8.11% of$2,594,386.68)for this SL-1 <br /> partial Phase I bond release. <br /> The Division currently holds a performance bond of$4,500,000 for the Elk Creek Mine. The <br /> most recent update of reclamation liability for the site prior to SL-1 is $4,323,977.80. The <br /> minimum amount that must be retained in accordance with Rule 3.03.1(3)is $4,113,573.04 <br /> ($4,323,977.80 - $210,404.76 (SL-1 Phase I)). The Division determined the estimate to <br /> complete remaining reclamation work at the Elk Creek Mine to be $3,865,886. The Division <br /> proposes to release $210,404.76 associated with the Phase I SL-1 bond release. <br /> Maximum Bond Release Amounts per Rule 3.03.1(2) <br /> SL-1 (19.4 acres) Total (239.2 acres) <br /> Phase 1 -60% $210,404.76 $2,594,386.68 <br /> Phase 11 -25% $87,668.65 $1,080,994.45 <br /> Phase III - 15% $52,601.19 $648,596.67 <br /> Total $350,674.60 $4,323,977.80 <br /> Table 2: Maximum Bond Release Amounts <br /> C-1981-022,SL-1 Page 17 of 19 <br />