My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-18_REPORT - M1978208
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1978208
>
2019-10-18_REPORT - M1978208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 6:57:01 AM
Creation date
10/18/2019 12:32:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978208
IBM Index Class Name
REPORT
Doc Date
10/18/2019
Doc Name Note
Unofficial Report/Maps
Doc Name
Annual Fee/Report/Map
From
Elk Creek Sand & Gravel, LLC
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D,RMS SUPPLEMENTAL REPORT:Concerns in re COMPLIANCE RE BENCHING within HIGHWALL <br /> 12/6/18 MLRB 1978-208 Shaffers Crossing <br /> C%n n YLO <br /> REPORT: Notice of Inspection 3/13/18 <br /> Inspector Michael Cunningham <br /> Division of Reclamation Mining and Safety <br /> Response from Operator Prepared by MOORESJ, Min. Eng., CSM, BSc.Geol.,Geophysics(II), Elk Creek <br /> Companies, LLLP./S/Elk Creek,Sand&Gravel LLC <br /> Reviewed and Accepted/endorsed by BROCKMAN,S, PE Cave Eng. (license# ) <br /> Brockman Engineering Inc, Conifer CO 80433 <br /> 12/7/18 <br /> ISSUE <br /> Inspector notified Operator Representative on or around 3/13/18 that there was an issue relating to <br /> Inspection conducted in which Inspector indicated a concern that the bench configuration within the <br /> confines of the permitted and approved highwall design was not being followed. <br /> The inspector indicated that he had participated in site walk-through and in that walkthrough he made a <br /> number of observations:a)signage was insufficient and did not comply with the terms of the <br /> Regulations enforced under the Division Rules, b)that a weed control plan was absent from the <br /> Operators file or not otherwise sufficient and that the Division was requiring that the Operator provide a <br /> technical revision to its permit such that this addressed and conformed to the regulatory requirement <br /> under the Rules to include an acceptable weed control plan <br /> c)that the Inspector was unable to visually confirm that the Operator was complying with the stipulated <br /> bench configurations, particularly the bench width relative to the bench height, in order to conform to <br /> the recommendations presented under the geotechnical report filed om behalf of the Operator in 2006 <br /> (the Brierley Geotechnical and Slope Stability Analysis) <br /> This report addresses the issue specifically of the HIGHWALL BENCH WIDTH CONFIGURATION such that <br /> the specified configuration is an 8'-0" bench no 76 degree angle of repose,and the benches are 12'-0" <br /> by 35'-0" in the perpendicular(See exhibit FIGURE 10c 2006 BEI ODP Final USES and Plan PDF)wherein <br /> the final Bench design for the highwall submitted to and accepted by DRMS Board, based upon Division <br /> recommendations,complies with the calculations and toppling or over turning moment restrictions <br /> from the 2006 Geotechnical report <br /> SPECIFIC CONCERN BY DIVISION STAFF <br /> The specific issue that was a concern raised by Vision Staff is that the prescribed bench configuration as <br /> indicated,since it did not exist,would have to be implemented in order to bring the highwall into <br />
The URL can be used to link to this page
Your browser does not support the video tag.