My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-16_REVISION - M1993023
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993023
>
2019-10-16_REVISION - M1993023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:28 PM
Creation date
10/16/2019 2:15:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993023
IBM Index Class Name
REVISION
Doc Date
10/16/2019
Doc Name
Request for Technical Revision
From
Moffat County
To
DRMS
Type & Sequence
TR1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of cow <br /> "�. COLORADOTRoi CLAMATION, MINING ANDFETY <br /> */876* 1313 Sherr �- ,ver,Colorado 80203 ph(303)866-3567Cent <br /> ACY/thm o `�+ �D <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET ' u 2019 <br /> File No.: M- 1993-023 Site Name:Cross Mountain Pit 1 MININGO"REC <br /> 44/1444),"'m PON <br /> County Moffat TR# (DRMS Use only) <br /> Permittee: <br /> Moffat County <br /> mmOperator(If Other than Permittee): o <br /> Dan Miller, Director, Moffat County Road & Bridge n w <br /> Permittee Representative: b <br /> � N <br /> Please provide a brief description of the proposed revision: <br /> Moffat County is requesting a change to the seed mix design for the Cross Mountain Pit 1 for <br /> the remaining 8.31 acres. Attached is the sced mix we arc pr-epesilfg to use. The application <br /> will be by drill seeding. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, a o <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <L <br /> oci <br /> to the permit. 3 CP- <br /> The <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.