My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-15_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-10-15_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:37:18 AM
Creation date
10/16/2019 9:00:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/15/2019
Doc Name Note
TR115
Doc Name
Update
From
CC&V
To
DRMS
Type & Sequence
SA1
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1: TR-115, SA-01 Core Shed <br /> Direct Costs <br /> Task Cost Summary of Estimate RSMEAN Reference Comments <br /> Building Demolition, Large Urban <br /> project,Steel,incudes 20 mile W 40 ft.X L 100 ft.X H 16 ft. <br /> Demolition building $17,920 haul,excludes foundation 024116130020 Buried in an OSA or VLF. <br /> demolition,dump fees <br /> Building footings and foundations <br /> demolition,floors,concrete slab W 40 ft.X L 100 ft.X H 6 in. <br /> Demolition slab $3,840 on grade,concrete,wire mesh 024116170420 (6 inch concrete slab). <br /> reinforced,6"thick,excludes Buried in an OSA or VLF. <br /> disposal costs and dump fees <br /> Direct Costs total: $21,760 <br /> Indirect Costs <br /> Task Percent <br /> All in DRMS indirect costs 1 18.50% total: $4,026 <br /> Indirect Costs Total: $4,026 <br /> Direct+indirect Subtotal: $25,786 <br /> Administrative <br /> Task I Percent <br /> DRMS administrative costs 1 5.00% 1 total: $1,289 <br /> TR115 Core Shed Required Financial Warranty $27,075 <br />
The URL can be used to link to this page
Your browser does not support the video tag.