Laserfiche WebLink
i <br /> f <br /> Table 1. Schedule of Drill Holes <br /> (not in order of drilling) <br /> HOLE I.D. EXPECTED DEPTH "F_ECTED_ff INE„CgNDITIONS <br /> 1 90 MINED OUT <br /> 2 100 MINED OUT <br /> 3 75 MINED 'OUT <br /> 4 75 PILLAR <br /> 5 75 PILLAR <br /> 6 85 SURFACE MINED AREA <br /> 7 115 PILLAR <br /> 8 115 MINED OUT <br /> 9 115 PILLAR <br /> 10 125 PILLAR <br /> 11. 135 PILLAR <br /> 12 50 SURFACE MINED AREA(?) <br /> 13 95 PILLAR <br /> 14 65 ROOM <br /> 15 145 ROOM <br /> 16 45 UNMINED, NEAR CROP <br /> 17 40 BARRIER PILLAR <br /> 18 95 HAULAGE MAIN <br /> 19 95 BARRIER PILLAR <br /> 20 130 BARRIER PILLAR <br /> 21 130 HAULAGE MAIN <br /> 22 150 MAIN, WATER TABLE TEST <br /> 23 130 HAULAGE MAIN <br /> 24 75 MAIN <br /> 25 75 CHAIN PILLAR <br /> 26 65 MAIN <br /> 27 100 MAIN <br /> 28 85 MAIN ENTRY/SLOPE <br /> 29 65 MAIN ENTRY <br /> 30 60 MAIN ENTRY <br /> 31 55 UNMINED NEAR CROP <br /> 32 60 ROOM <br /> 33 60 SURFACE MINED ZONE <br /> o mm <br />