2019-10-11_REVISION - M1988108
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988108
>
2019-10-11_REVISION - M1988108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:36:24 AM
Creation date
10/15/2019 12:45:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988108
IBM Index Class Name
REVISION
Doc Date
10/11/2019
Doc Name
Adequacy Review #2
From
DRMS
To
Arcosa Materials
Type & Sequence
AM3
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ragsdale <br /> October 11, 2019 <br /> Page 3 of 3 <br /> 3) How many cubic yards will need to be moved to create re-slope the shoreline of the 10 acre pond to 3:1 as <br /> required? How much earthwork will be required to repair the existing erosion gully damage around the north end <br /> of the pit if the walls will not be re-sloped? <br /> 4) How many cubic yards of topsoil will be needed to replace 6-12" of topsoil over the pit slopes and floor? <br /> 5) How much earthwork is required to construct the proposed diversion berms in the processing area? <br /> 6) How many yards of material(decomposed shale?)will be needed to construct the dam between the 10 acre lake <br /> and vegetated pit floor area. What engineering work will be required(design, QA/QC, compaction testing)? <br /> 7) Specific construction information(dimensions, construction type, foundation/footer size and thickness, etc) <br /> will need to be provided for buildings that will be removed from the current processing area so that demolition <br /> and disposal costs can be calculated for those structures. <br /> 8)Mobilization/Demob costs for all equipment required to complete the specified reclamation(scraper, dozer, <br /> grader,track hoe, tractor and seeder, water truck, etc). <br /> This is not intended to be a comprehensive list of information needed to calculate the reclamation bond,but <br /> should serve as a guide as to what kind of data is required for the state to accurately estimate the reclamation bond <br /> amount. <br /> Additional Information: Please provide the weed control plan submitted with the previously withdrawn TRO1 as <br /> a separate appendix to AM03 through adequacy response so that it can be properly approved and incorporated <br /> into the permit. <br /> This concludes the Division's second adequacy review of this application. This letter shall not be construed to <br /> mean that there are no other technical deficiencies in your application. Other issues may arise as additional <br /> information is supplied. Please remember that the decision date for this amendment application is October 31, <br /> 2019. As previously mentioned, if you are unable to provide satisfactory responses to any inadequacies prior to <br /> this date, it will be your responsibility to request an extension of time to allow for continued review of this <br /> application. If there are still unresolved issues when the decision date arrives and no extension has been <br /> requested, the application may be denied. If you have any questions,please contact me at(303) 866-3567 x8140. <br /> Sincerely, <br /> Eric Scott—Environmental Protection Specialist <br />