My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-11_HYDROLOGY - C1980004
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980004
>
2019-10-11_HYDROLOGY - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 4:18:39 AM
Creation date
10/15/2019 10:23:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Hydrology
Doc Date
10/11/2019
Doc Name
Quarterly Sediment Pond/Impoundment Report
From
DRMS
To
J.E. Stover & Associates
Annual Report Year
2019
Report Quarter_Month
3
Email Name
CCW
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L ORAD <br /> u <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural resources <br /> 1313 Sherman Street, Room 215 <br /> Denver, Co 80203 <br /> October 11,201 <br /> Janes Stover <br /> J.E. Stover and Associates <br /> 2352 North 7`h Street,Unit B <br /> Grand Junction, CO 8101 <br /> IRE: Mc lane Canyon Mine, -19 0-004 <br /> rd Quarter 2019 Pond Inspection Report <br /> Dear Mr. Stover, <br /> The Colorado Division of Reclamation,Mining and Safety(the Division)has received <br /> and reviewed the 3rd Quarter 2019 Pond Inspection Report for the McClane Canyon <br /> Dine. The report was received on October 4, 2019. The Division has the following <br /> comments: <br /> 4. .90 —All Impoundments are inspected quarterly,by a qualified person designated by the <br /> operator, for the appearance of structural weakness and other hazardous conditions. The reports <br /> are retained at the office of J.E. Stover and Associates in Grand Junction,CO, and copies of the <br /> reports are submitted to the Division on a quarterly basis. <br /> The inspection of the pond was conducted by Chuck Sileno on September 18,2019. The report <br /> indicates that there were no issues. The field inspections by the Division reflect the information <br /> in the report. <br /> This concludes the Division's review of the Yd Quarter 2019 Pond inspection Report for <br /> the Mc lane Canyon Mine. If you have any questions,please contact me at o )- 6- <br /> x 8 144 or at clayton.wein@state.co.us. <br /> Sincerely, <br /> c <br /> Clayton Wein <br /> Environmental Protection Specialist <br /> 1 '° ° <br /> ,� , <br /> 1313 Sherman Street,Room 215,Denver,Co 80203 P 303.86 .3567 F 303.832.8106 http-.//mining.state.co.us <br /> ,Jared S.Polls,Govemor I Dan Gibbs,Executive Director I Virginia Brannon,Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.