My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-10_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2019-10-10_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:30 PM
Creation date
10/15/2019 10:20:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
10/10/2019
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Section_Exhibit Name
RCE SL19
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1. Summary of Past Bond Releases at Trapper Mine and Acreage Adjustments <br /> Submittal Proposed Released Released Released Reduction in <br /> Decision Area Ph I Area Ph II Area Ph III Liability <br /> Date(s) (acres) (acres) (acres) <br /> Loadout 5 Dec 1985 2 2 2 $0.00 <br /> SL-01 12-Feb-98 21511.7 0.0 $0.00 <br /> (PhI) <br /> 14-Dec-98 <br /> (Ph II) 11548.0 0.0 $0.00 <br /> SL-02 23-Dec-99 0.0 319.5 0.0 $0.00 <br /> SL-03 19-Apr-02 0.0 592.7 0.0 $0.00 <br /> SL-04 18-Nov-03 0.0 0.0 11857.7 $821659.00 <br /> SL-05 11-Jun-04 823.9 0.0 0.0 $0.00 <br /> SL-06 6-Sep-05 0.0 819.E°°1 0.0 $215871606.00 <br /> SL-07 16-May-06 0.0 0.0 762.8 $3711146.00 <br /> SL-08 21-Nov-08 476.6 0.0 0.0 $0.00 <br /> SL-09 2-Dec-08 0.0 294.6 0.0 $8981333.00 <br /> SL-10 17-Nov-08 0.0 0.0 305.0 $2281664.00 <br /> SL-11 7-Jan-11 57.8 0.0 0.0 $0.00 *2 <br /> SL-12 27-March-12 0.0 165.5 0.0 $6951081.66 <br /> SL-13 27-March-12 0.0 0.0 323.5 $0.00 <br /> TR-109 24-Aug-12 0.0 5.2*3 0.0 0.0 <br /> TR-109 24-Aug-12 -24.8 -17.5*4 -5.9 0.0 <br /> TR-I I I 24-April-13 -10.4 -4.6*5 0.0 0.0 <br /> SL-14 5-Dec-13 417.8 0.0 0.0 $2106813 97.69 <br /> SL-15 10-Jan-14 120.4 0.0 0.0 $5201670.46 <br /> SL-16 21-Jan-15 0.0 277.80 0.0 $3761228.82 <br /> TR-114 11-May-15 -0.7*' -0.7 -0.7 0.0 <br /> SL-17 29-Nov-16 0.0 0.0 448.4 $6961737.41 <br /> TR-119 8-Jun-18 -161.4* -161.4*7 -161.4*7 <br /> SL-18 25-July-19 175.3 0.0 0.0 $8581015.48 <br /> TOTALS Not including 4,368.2 31838.7 39529.4 <br /> Loadout <br /> SL19 Proposed 0.0 376.1 0.0 $767,029.62 <br /> *I- Changed from 819.1 during review of TR-109 as per DRMS letter of 21 August 2012. <br /> *2- No change in liability occurred in SL-11,the liability amount at the time of the approval of <br /> SL-I I was updated as a result of Midterm Review 6 (MT6). <br /> *3- As per SL-14 findings, acres had not previously been phase II released. <br /> Permit Number C 1981010 <br /> SL19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.