Laserfiche WebLink
NORTHWEST OLo Do CONSULTANTS, INC. <br /> Project: Defuse Pile Project No.: 99-3983 ]ate: /27/1 <br /> Time: 4.0 <br /> Location: Foidel creek Mine Report No.: 93 Mileage: 44 <br /> Client: T wrent mile Coal Co. Engr=/Tech: CR <br /> Work Performed: <br /> s requested, we visited the project site on today's date and conducted compaction test l o's 580 through 582 on <br /> the fill materials being placed within the Defuse Pile. <br /> Tvwrentymile Coal company crews placed and compacted processed waste coal in the Refuse Pile. <br /> We also obtained a sample of material and returned it to our laboratory in Steamboat Springs, co for standard <br /> checkpoint Proctor testing. The sample matched a previous Proctor 1 P for this project. <br /> The}nearly site specific safety training was also completed during today's site visit. <br /> Remarks: <br /> The material tested today generally met project specifications for compaction. <br /> Please refer to attached sheet for results of today's testing. <br /> Verbal Discussions: <br /> Tvwrentyrnile coal co.was notified of today's test results. <br />