Laserfiche WebLink
• Earthwork <br /> Demolition <br /> Fiore <br /> Site Utilities <br /> Structural Excavation <br /> Overlot&Finish Grading <br /> & SONS, INC. <br /> Earthwork <br /> Description QTY Unit Unit Total <br /> Mobilize (If necessary) 1 LS $ 6,000.00 $ 6,000.00 <br /> Survey River Diversion 1 LS $ 3,200.00 $ 3,200.00 <br /> Erosion Control Measures 1 LS $ 2,000.00 $ 2,000.00 <br /> Excavate, Prep and Backfill Diversion Structure 1 LS $ 38,000.00 $ 38,000.00 <br /> Sheet Piling PZ-22- non coated 1540 SF $ 31.80 $ 48,972.00 <br /> Concrete Structure 1 LS $155,000.00 $ 155,000.00 <br /> Burried Rip-rap Dike 150 CY $ 85.00 $ 12,750.00 <br /> Type H RipRap(30"Thickness) 95 Cy _A 85.00 $ 8,075.00 <br /> Imperial Smart Gates 2 EA $ 28,980.00 $ 57,960.00 <br /> Sluice Gate 0 EA $ 20,975.00 $ - <br /> Dewater Support (4 weeks Generator& Permit) 1 LS $ 28,980.00 $ 28,980.00 <br /> Reclaim Site 0 LS $ 4,000.00 $ - <br /> SUBTOTAL $ 360,937 <br /> Bond @1% 1 LS $ 3,609.37 $ 3,609 <br /> TOTAL $ 364,546 <br />