Laserfiche WebLink
f <br /> EXHIBIT C <br /> Wildlife Stipulations <br /> • Mule Deer Timing Restriction For Sections 9, 10, 15, 16, T4N R10OW (The Sloughs) only): Mining <br /> operations conducted between December 1 through April 15 are limited to 10:00 am and 3:00 pm. <br /> Leverite, CPW, and the State Land Board will conduct a consultation prior to any mining on the <br /> Sloughs parcel. <br /> • Raptor nest surveys (for entire lease): Conduct raptor nest surveys prior to disturbance. If active <br /> nests are located consultation with the State Land Board and Colorado Parks and Wildlife will occur <br /> to determine appropriate setbacks prior to any construction. <br /> GL 112574 Revised DOL 11/2018 <br /> Page 16 of 16 <br />