My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:25:02 AM
Creation date
10/9/2019 2:24:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 5 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: AIRS ID Number: <br /> [Leave blank Unless APCD has already assigned a permit r,and AIRS ID) <br /> Section 2 - Requested Action <br /> ❑� NEW permit OR newly-reported emission source(check one below) <br /> ❑✓ STATIONARY source ❑ PORTABLE source3 <br /> -OR- <br /> ❑ MODIFICATION to existing permit(check each box below that applies) <br /> ❑ Change equipment ❑ Change status: ❑ Add point to existing <br /> portable/stationary permit <br /> ❑ Change processing limit ❑ Transfer of ownership' ❑ Change company name' <br /> ❑ Other(describe below) <br /> -OR- <br /> ❑ APEN submittal for update only(Blank APENs will not be accepted) <br /> -ADDITIONAL PERMIT ACTIONS- <br /> ❑ APEN submittal for permit-exempt/grandfathered source <br /> ❑ Voluntary permit for otherwise permit-exempt source' <br /> Additional Info ix Notes: <br /> 3 Note that a permit-exempt portable source may be required to obtain a permit based on the facility-wide emissions totals of <br /> the operating location. <br /> 4 For transfer of ownership,a completed Transfer of Ownership Certification Form(Form APCD•104)must be submitted. <br /> 'For company name change.a completed Company Name Change Certification Form (Form APCD-106)must be submitted. <br /> Section 3 - General Information <br /> F/1 Crusher Only ❑ Screen Only ❑ Crusher-Screen Combo Unit <br /> If"Crusher-Screen Combo Unit"is selected,the crusher and screen must be bolted together and must always travel as one unit. if <br /> this is not true,you must fill out a separate APEN for each piece of equipment. <br /> Manufacturer: TBD Model No.: TBD Serial No.: TBD <br /> Company equipment Identification No. (optional): Feeder Breaker <br /> For existing sources, operation began on: NA <br /> For new or reconstructed sources, the projected start-up date is: TBD <br /> ❑Check this box if operating hours are 8,760 hours per year; if fewer, fill out the fields below: <br /> Normal Hours of Source 24 hours/day 5 days/week 52 weeks/year <br /> Operation: _ <br /> Seasonal use Dec- Mar- June- Sept- <br /> percentage: Feb: 100 % May: 100 % Aug: 100% Nov: 100 % <br /> How many material transfer points are included on this equipment? 2 <br /> A transfer point is defined as any location where material moves from a conveyor to another conveyor,screen,or pile. It <br /> does not include the transfer of material into a hopper. <br /> carom>oo <br />
The URL can be used to link to this page
Your browser does not support the video tag.