Laserfiche WebLink
Uinta Basin Sand,LLC <br /> Crushing and Screening Emissions Calculator <br /> Instructions:Fill in your information into the teal-colored boxes and refer to the yellow highlighted boxes for your reportable calculated emissions. <br /> If you have multiple pieces of equipment,only use the calulator for one piece of equipment at a time to get accurate results for APEN and Permitting <br /> requirements.For example,calculate the emissions from your crusher,clear out the calculator and then calculate emissions from the screen since the need for <br /> an APEN is based on the emissions from the single piece of equipment.There is an option for combo units. <br /> If values appear as gray and/or crossed out,they are not above the reporting threshold and can be ignored. <br /> Type of equp pro C/Wt1A APEN Required? YES <br /> Do you control PM emissions with water spray? W Permit Required? NO <br /> Do materials qo through secondary crushimi?,I No <br /> [intentionally tell blank, Inns Total Emissions(tons/year) <br /> Do materials go through secondary screening? Uncontrolled Controlled <br /> [intentionally left blank) tons 7.37 7.37 <br /> Annual Amount of Material Processed: 1 WU tons per year M,o 2.99 2.99 <br /> Number of Material Transfer Points: MIe a 4', o 4t <br /> TSP Emission Calculations <br /> Uncontrolled Emission Uncontrolled TSP Emission <br /> Controlled <br /> Emission Source Control% TSP Emission <br /> Factor(lb/ton) (ton/year) (ton/year) <br /> CRUSHER HOPPER LOADING 0.0004 0.2462 0.00% 0.2462 <br /> PRIMARY CRUSHING 0.0054 3.3750 0-00% 3.3750 <br /> K III 114I1,14, 0.0/50 0.4x100 (1(1(1',. 0.0000 <br /> SECONDARY CRUSHING 0.0054 0.0000 0.00% 0.0000 <br /> R1 u Rf I Nirl(, U,0J51) O.Lxxx) 0.0000 <br /> PO CONVEYORS AND TRANSFER LINTS 0.0030 3.7500 0.00% 3.7500 <br /> Total TSP: - 7.371 0.00%1 7.37 <br /> PM,,,Emission Calculations <br /> Uncontrolled Emission Uncontrolled PM,.Emission Controlled <br /> Emission Source Factor(lb/ton) Near) Control% PM,"Emission <br /> (ton <br /> (ton/year) <br /> CRUSHER HOPPER LOADING 0.0002 0.1165 0.00% 0.1165 <br /> PRIMARY CRUSHING 0,0024 1.5000 0.00% 1.5000 <br /> SC Rt.I WNG 0."; 0.(1000 O.DD% 0.0000 <br /> SECONDARY CRUSHING 0.0024 0.0000 O.DO% 0.0000 <br /> kF WRFEIRNG 0.0W 0,0000 0.00% 0.0000 <br /> CONVEYORS AND TRANSFER POINTS 0.0011 1.3750 O.DO% 1.3750 <br /> ota - 2.991 0.00%1 2.99 <br /> PMt s Emission Calculations <br /> Controlled <br /> Uncontrolled Emission Uncontrolled PM,Emission <br /> Emission Source Control% PMt_z Emission <br /> Factor(lb/tool ItonNeerl <br /> Iton/year) <br /> CRUSHER HOPPER LOADING 0.0000 0.0175 0.00% 0.0175 <br /> PRIMARY CRUSHING 0.0004 0.2250 0.00% 0.2250 <br /> SCRLENJWG 0.064,i 0.0" 0.00% 0.0000 <br /> SECONDARY CRUSHING 0.00D4 0.ODOD 0.00% 0.0000 <br /> RLSCRFFNRK: 0.0013 0,(" 0.00% 0.000O <br /> CONVEYORS AND TRANSFER POINTS 0.0002 0.2063 0.00% 0.2063 <br /> ota M).,. 0.45 0.00% 0.45 <br /> PTE Calcs.UBS_Mine Site-V2.xlsx 9/3/2019 <br />