My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:25:02 AM
Creation date
10/9/2019 2:24:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 5 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compression Ignition Engine APEN <br /> Form APCD-233 <br /> JAV Air Pollutant Emission Notice (APEN) and <br /> Application for Construction Permit <br /> All sections of this APEN and application must be completed for both new and existing facilities, including <br /> APEN updates. Incomplete APENs will be rejected and will require re-submittal. Your APEN will be rejected if <br /> it is filled out incorrectly, is missing information, or locks payment for the filing fee. The re-submittal will <br /> require payment for a new filing fee. <br /> This APEN is to be used for compression ignition or diesel reciprocating internal combustion engines. If your <br /> emission unit does not fall into that category, there may be a more specific APEN available for your operation <br /> (e.g. mining operations, asphalt plant, crusher, screen, etc.). In addition, the General APEN (Form APCD-200) <br /> is available if the specialty APEN options do not meet your reporting needs. A list of all available APEN forms <br /> can be found on the Air Pollution Control Division(APCD)website at: www.colorado.gov/cdphe/apcd. <br /> This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to <br /> expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase <br /> production, new equipment, change in fuel type, etc.). See Regulation No. 3, Part A, II.C. for revised APEN <br /> requirements. <br /> Permit Number: AIRS ID Number: <br /> [Leave blank unless APCD has already assigned a permit=and AIRS ID] <br /> Section 1 - Administrative Information <br /> Company Name': Uinta Mining LLC <br /> Site Name: Skull Creek Sand Project <br /> Site Location: approx. 2.7 miles NW site outdo: Moffat <br /> of Massadona <br /> NAICS or SIC Code: 1499 <br /> Mailing Address: 6602 Ilex Circle <br /> (include Zip Code) <br /> Naples, Florida 34109 Contact Person: Robert Nead <br /> Phone Number: 239-825-2332 <br /> Portable Source E-Mail Address: basic@altoncoal.com <br /> Home Base: <br /> ' Use the full,legal company name registered with the Colorado Secretary of State.This is the company name that will appear <br /> on all documents issued by the APCD.Any changes will require additional paperwork. <br /> 2 Permits,exemption letters,and any processing invoices will be issued by the APCD via e-mail to the address provided. <br /> IV COLORIDO <br /> Form APCD-233 - Compression Ignition Engine APEN- Revision 3/2019 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.