Laserfiche WebLink
Exhibit E Skull Creek Sand Project <br /> Phase 3- Revegetation <br /> As needed, additional augmented supplementary seeding will occur in areas where revegetation <br /> has not been established within the 1-2 year time frame following the first application of mulch <br /> and seed. <br /> Schedule <br /> The approximate schedule for application of these reclamation measures is depicted in Map E- <br /> 2. The completion of all backfill, soil placement, mulching and seeding is expected to be <br /> complete within approximately 4 years from the start of mining. Final Phase 3 completion will <br /> be dependent upon the need for augmented seeding and the adequate establishment of <br /> reclaim vegetation. <br /> Land Use <br /> As described in Exhibit H, Final reclamation is designed to restore disturbed areas to a safe, <br /> stable condition and to reestablish the productivity of the land consistent with the postmining <br /> land use. The proposed postmining land uses of wildlife habitat, and watershed reflects the pre- <br /> disturbance use of this and adjacent areas, existing land use plans and policies, and practical <br /> constraints relative to land use capability and condition. <br /> The skull Creek Sand Project reclamation plan has been designed to successfully meet these <br /> objectives and will result in effective temporary stabilization, and a postmining configuration <br /> which blends with the surrounding terrain and provides environmental values consistent with <br /> or superior to those which existed prior to mining. <br /> 7 <br /> 10/3/19 <br />