Laserfiche WebLink
Wnta Basin Said,I I C <br /> Unpaved Haul Roads: Pits to Spoils Pile <br /> Unpaved Haul Roads Uncontrolled Controlled <br /> Pollutant Lbs/hr TwWyr Lbs/hr Tontityr <br /> Total Particulate 47,32 147.64 11.83 36.91 <br /> PM, 1304 40.69 326 40.69 <br /> PM,., 1.30 4.07 0.33 1.02 <br /> PM= (k((s112)^0.7)((W/3)^0.45)'((365•P)/365) Pounds per VMT <br /> PM,o= (k'((sll2)^0.9)((W13)^0.45)'((365-P)1365) Pounds per VMT <br /> PM;._ (k2((s/12)^0.9)((W/3)^0.45)'((365-P)1365) Pounds per VMT <br /> WHERE <br /> k= particle size factor 30 um from AP-42 Table 13.2.2-2 49 <br /> k.= panicle size factor<10 um from AP42Table 13.2.2-2 1 5 <br /> k2= panicle size factor <2.5 um from AP-42 Table 13.2.2-2 0 15 <br /> s= sill content default mean value AP-42 page 13.2.2-2 7 1 AP-42 Table 13.2.1-3 sand 8 gravel processing <br /> W= Mean vehicle weight(tons)[Empty trucks[ 57 <br /> W= Mean vehicle weight(tons)[Loaded Trucks) 126 <br /> P= number of days in a year with at least 0.01 inches of precip 48.5 Ave from precip.Data of Massadona,Go for 2012.2017 <br /> Haul Road <br /> Emission Factors Materials and Trucks <br /> Into Pk Out of Pit Unit(lbs per vehicle <br /> Pollutant jEmpty Trucks) (Loaded Trucks mile traveled) Material:Coal <br /> PM= 11.074 15,844 LbsNMT Material(tonslyear) 3.010,931 <br /> PM„= 3.052 4.367 ..bsNMT Empty Weight(tons) 57 <br /> PM.,= 0.305 0.437 ,.hsfVMT Loaded Weight(tons) 126 <br /> Weight of Sandstone Load 69.4 <br /> VMTNEAR(into pit)= 10.970 Mean Vehicle Weight(empty) 57 <br /> VMT/YEAR(out of pit= 10.970 Mean Vehicle Weight(loaded) 126 <br /> Tfips/year(empty into pit) 43.385 <br /> Length of road one way(it) 1 335 -rm.fu) T ripslyear(loaded out of it) 43.385 <br /> Miles/Trip 0.3 Miles <br /> Tripslyear(into pit) 43,385 <br /> Trips/year(out of pit) 43,385 <br /> Control Efficiency for roads 751%Mall Chloride <br /> HOURS OF OPERATION AP-42 Fifth Edition Volume 1,Supplement E December 2003 <br /> Hours per day 24 Section 13 Miscellaneous Sources,1112006 Revision <br /> Days per week 5 13.2 Fugitive Dust Sources <br /> Weeks per year 52 13.2.2 Unpaved Roads <br /> Hours per year 6240 <br /> PTE Calcs.UBS_Mine Site-V2.xlsx 9/3/2019 <br />