Laserfiche WebLink
-4- <br /> 12. Primau future Post-minin land use check one): <br /> 1-1 Cropland(CR) M Pastureland(PL) General Agriculture(GA) <br /> 1.77 Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one : <br /> El Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) -H Forestry(FR) Wildlife Habitat(WL) <br /> tiResidential(RS) M Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Excavator and Haul Truck <br /> 15. On Site Processing: F7 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> The excavator will excavate the resource,load to feeder breaker,transported to a conveyor/stacker The resource will then be loaded in haul trucks or over the road trucks to be taken to the market source <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> Oil, fuel, coolant, greases for diesel equipment. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />