My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-09_REVISION - M1983194A
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-10-09_REVISION - M1983194A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:03 PM
Creation date
10/9/2019 12:30:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194A
IBM Index Class Name
REVISION
Doc Date
10/9/2019
Doc Name
Completeness Response
From
Natural Soda, LLC
To
DRMS
Email Name
ACY
SJM
THM
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: TR-44 Updates <br /> Site: Nahcolite Project Permit Action: TR-44 Permit/Job#: M1983194 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 10/1/2019 County: Rio Blanco Filename: M194-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> Ola Demo of Plant,pipelines,powerlines and parking DEMOLISH 1 80.00 $1,913,936 <br /> lot <br /> 02a Borehole P&A BOREHOLE 1 610.00 $600,185 <br /> 03a Regrade Process Ponds DOZER 2 133.65 $60,772 <br /> 03b Decom act Process Pond RIPPER 2 6.85 $3,373 <br /> 03c Topsoil Process Pond DOZER 2 14.06 $6,394 <br /> 03d Reveg Process Pond REVEGE 1 28.50 $36,353 <br /> 04a Regrade Plant Area DOZER 2 23.69 $10,773 <br /> 04b Decompact Plant Area RIPPER 2 7.02 $3,457 <br /> 04c Topsoil Plant Area DOZER 2 6.07 $2,759 <br /> 04d Reveg Plant Area REVEGE 1 12.30 $15,689 <br /> 05a Regrade Well Pads DOZER 2 165.76 $75,377 <br /> 05b Topsoil Well Pads DOZER 2 34.04 $15,479 <br /> 05c Reveg Well Pads REVEGE 1 73.50 $88,014 <br /> 06a Decom act Roads RIPPER 2 4.82 $2,378 <br /> 06b Topsoil roads DOZER 2 4.44 $2,019 <br /> 06c Reveg Roads REVEGE 1 9.00 $11,480 <br /> 12a Initial Mobilization MOBILIZE 1 8.00 $14,500 <br /> 12b Secondary Mobilization MOBILIZE 1 8.00 $2,422 <br /> SUBTOTALS: 1229.7 $2,865,360 <br />
The URL can be used to link to this page
Your browser does not support the video tag.