Laserfiche WebLink
DEMOLITION WORK <br /> Task description: Demo of Plant,pipelines,powerlines and parking lot <br /> Site: Nahcolite Project Permit Action: TR-44 Permit/Job#: M1983194 <br /> PROJECT IDENTIFICATION <br /> Task#: OIA State: Colorado Abbreviation: None <br /> Date: 10/1/2019 County: Rio Blanco Filename: M194-01a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adjustment: 95.50% <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Total Cost <br /> Cost <br /> NSI Plant 200'L x 227'W Plant(3S)demo./off-site 1,929,500.00 CF $0.71 $1,371,681.55 <br /> x 425H disposal in approved <br /> landfill-Max. 30 mile <br /> haul <br /> Product Storage 95'L x 95'W x Plant(3S)demo./off-site 451,250.00 CF $0.71 $320,793.63 <br /> Dome 50'H disposal in approved <br /> landfill-Max.30 mile <br /> haul <br /> Removal of NSI Plant 200'L x 227'W Demo. and on-site 45,400.00 SF $1.25 $56,532.08 <br /> Slab x 8" disposal in excavated pit, <br /> 8 in.thick-Max.200 ft. <br /> push <br /> Removal of Storage 95'L x 95'W x8" Demo. and on-site 9,025.00 SF $1.25 $11,237.93 <br /> Dome Slab disposal in excavated pit, <br /> 8 in. thick-Max. 200 ft. <br /> push <br /> Scale Building 108'W x 18'L x Plant(1S)demo./off-site 19,440.00 CF $0.72 $13,919.04 <br /> 10'11 disposal in approved <br /> landfill-Max. 30 mile <br /> haul <br /> Removal of Scale 108'W x 18'L x Demo.and on-site 1,944.00 SF $1.25 $2,420.67 <br /> Building Slab 8" disposal in excavated pit, <br /> 8 in.thick-Max.200 ft. <br /> push <br /> Tank Farm 30'W x 50'H Haul tank to certified 5.00 EA $760.00 $3,800.00 <br /> salvage dump-3,000 to <br /> 5,000 gal.tank <br /> Removal of 70 SgFt USER PROVIDED 70.00 Ft^2 $5.00 $350.00 <br /> Flagpole/Monument ITEM <br /> Demolition of 6'W x 18'L x Plant(3S)demo./off-site 1,080.00 CF $0.71 $767.77 <br /> Screening and Magnet 10'H disposal in approved <br /> System landfill-Max.30 mile <br /> haul <br /> Pipelines averaged to 34,948 LF Pipe,steel,welded 34,948.00 LF $6.37 $222,618.76 <br /> 10" diam connections- 10 in. <br /> diameter pipe <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 80.00 (unadjusted): $2,004,121.43 location): $1,913,935.97 <br />