My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-30_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-09-30_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 4:56:59 AM
Creation date
10/8/2019 1:02:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/30/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 ImNewlFields <br /> Cripple Creek&Victor Gold Mining Company Perspective.Vision.Solutions, <br /> Squaw Gulch Valley Leach Facility <br /> Phase 2A Part 2 Record of Construction <br /> Earthworks Testing Summary and Frequency <br /> Material Quantity Material <br /> Number of Tests Structural Fill Leak Detection Soil Liner Fill Drain Cover Fill <br /> Test Frequency (SF) Fill(LDF) (SLF) (DCF) <br /> Quantity of Material Placed (cy) 130,140 14 64,430 128,860 <br /> Particle Size Tests Performed 4 1 204 7 <br /> Specified Particle Size Test Frequency 50,000 10,000 4,000 20,000 <br /> Actual Particle Size Test Frequency 32,535 14 3,221 18,409 <br /> Atterberg Limit Tests Performed 4 1 204 7 <br /> Specified Atterberg Limit Test Frequency 50,000 10,000 4,000 20,000 <br /> Actual Atterberg Limit Test Frequency 32,535 14 3,221 18,409 <br /> Laboratory Compaction Tests Performed See Note 1 204 <br /> Specified Compaction Test Frequency 50,000 N/A 4,000 N/A <br /> Actual Compaction Test Frequency N/A 3,221 <br /> Permeability Tests Performed 555 <br /> Specified Permeability Test Frequency N/A N/A 4,000 N/A <br /> Actual Permeability Test Frequency 1,171 <br /> Moisture Content Tests Performed See Note 1 1 171 7 <br /> Specified Moisture Content Test Frequency 2,000 10,000 500 20,000 <br /> Actual Moisture Content Test Frequency N/A 14 377 18,409 <br /> Field Nuclear Density Tests Performed See Note 1 171 <br /> Specified Nuclear Density Test Frequency 2,000 N/A 500 N/A <br /> Actual Nuclear Density Test Frequency N/A 377 <br /> Field Depth Verification Tests Performed 110 <br /> Specified Depth Verification Test Frequency N/A N/A 2.0 test/ac N/A <br /> Actual Depth Verification Test Frequency 2.75 <br /> Notes: <br /> 1.The method of compaction technique was used in accordance with the project technical specifications due to the large <br /> 2.All frequencies are based on quantities in cubic yards. <br /> 3. N/A= Not Applicable <br /> 4. Number includes only record samples tested during Phase 2A Part 2 work <br /> 5. Number includes both record and control samples(control samples taken from 2016 certified stockpile) <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.