Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 2 . <br /> Record of Construction Report <br /> 475.0106.032 <br /> September 30,2019 <br /> S. ENGINEER'S OPINION <br /> Based on the construction activities observed, testing performed, and inspections completed, <br /> NewFields certifies that the project was constructed in general accordance with the approved IFC <br /> Drawings and Technical Specifications. <br /> P.\Projects\Cert Report-Phase 2A Part 2\475 0106.032 CCV PHASE 2A Part 2 ROC REPORT.docx <br /> Page 15 <br />