My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-30_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-09-30_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 4:56:59 AM
Creation date
10/8/2019 1:02:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/30/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> September 30,2019 <br /> 3.3. Geosynthetics Quality Control Submittals <br /> The CQA Monitor reviewed and approved all geosynthetic QC submittals, including <br /> geomembrane installation personnel resumes,geomembrane roll QC certificates,geomembrane <br /> resin QC certificates,welding rod QC certificates,and geotextile QC certificates.The CQA Monitor <br /> tracked all geomembrane delivered to site in the site inventory. The site inventory, for all <br /> geomembrane used within the Phase 2A Part 2 area, is presented in Appendix 1.1. <br /> 3.3.1. Geomembrane Installation Personnel Resumes <br /> Tetra Tech submitted the resumes of all installation personnel prior to construction or <br /> repair activities within the Squaw Gulch VLF Phase 2A Part 2 area. The CQA Monitor <br /> verified that the Installation Superintendent, Master Seamer and QC Inspector possessed <br /> the installation experience required by the project Technical Specifications. <br /> Geomembrane installation personnel resumes for all crews that performed work on the <br /> Squaw Gulch VLF Phase 2A Part 2 area are presented in Appendix 1.2. <br /> 3.3.2. Geomembrane Roll QC Certificates <br /> The Squaw Gulch VLF Phase 2A Part 2 geomembrane was manufactured by AGRU <br /> America. Manufacturing Roll QC certificates were submitted for every roll of <br /> geomembrane (approximately one every 9,000 square feet), exceeding the required <br /> minimum frequency of one per 50,000 square feet of geomembrane. The roll QC <br /> certificates were reviewed by the CQA Monitor, ensuring all geomembrane materials met <br /> or exceeded the project Technical Specifications. The roll QC certificates for all <br /> geomembrane used within the Phase 2A Part 2 area are presented in Appendix 1.3. <br /> Geomembrane roll QC Certificates were provided for all 40 mil and 80 mil rolls installed <br /> within Phase 2A Part 2. <br /> 3.3.3. Geomembrane Resin QC Certificates <br /> AGRU America manufactured the geomembrane for the Squaw Gulch Phase 2A Part 2 VLF <br /> by using LLDPE polymer raw material (resin). Chevron Phillips Chemical Company <br /> provided resin QC certificates at a rate of one per rail car shipment. The resin QC <br /> certificates were reviewed by the CQA Monitor, ensuring all materials met or exceeded <br /> the project Technical Specifications. It is important to note that the Oven-Aging, UV- <br /> Aging, 2% Secant and Multi-Axial Tensile testing is considered formulation testing and is <br /> only completed when a resin formula has changed to ensure that the resin/additive <br /> formula is adequate.The resin QC certificates for all geomembrane used within the Phase <br /> 2A Part 2 area are presented in Appendix 1.4. <br /> P:\Projects\Cert Report-Phase 2A Part 2\475.0106.032 CCV PHASE 2A Part 2 ROC REPORT.docx <br /> Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.