Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> September 30,2019 <br /> All HVSCS piping was installed on approved geomembrane and kept in place during DCF <br /> placement. Approximately 24,349 linear feet of 4-inch diameter perforated CPeP, 1,089 linear <br /> feet of 8-inch diameter perforated CPeP, 3,900 linear feet of 12-inch diameter perforated CPeP, <br /> and 454 linear feet of 15-inch diameter perforated CPeP was installed. <br /> 2.9. Drain Cover Fill <br /> Approximately 128,860 cy of DCF was placed within the Squaw Gulch VLF Phase 2A Part 2 area in <br /> accordance with the project Technical Specifications. Crushed overburden material from the <br /> Cresson Project was processed between September 2013 and November 2014. All oversized <br /> material was removed from the overburden by screening the material over a vibrating 1 Y2 inch <br /> screen. After processing, the DCF was stockpiled north of the Squaw Gulch VLF in an area <br /> designated by CC&V. <br /> Tezak used 30- and 40-ton articulated haul trucks to haul DCF from the stockpile to the Squaw <br /> Gulch VLF Phase 2A Part 2 footprint. The DCF was placed in a 2-foot lift on approved <br /> geomembrane by LGP dozers.The DCF as-built boundary is shown on Record Drawing No. 11. <br /> Haul routes consisted of 4-foot lifts that were spread into 2-foot lifts upon finish grading the area. <br /> All DCF was placed in an uphill direction on slopes steeper than 4H:1V using dozers with GPS <br /> capability. <br /> A CCIA Monitor was present during all DCF placement activities to verify that the DCF was placed <br /> in accordance with the project Technical Specifications and that no damage to the geomembrane <br /> occurred. If any damage to the geomembrane was noted, work activities were paused, and the <br /> damage was repaired prior to resuming DCF placement. The DCF As-Built Isopach is shown on <br /> Record Drawing No. 11. <br /> 2.10. Miscellaneous <br /> After geomembrane was approved and DCF was placed within the eastern end of the project, a <br /> mine haul truck mistakenly drove approximately 1,300 feet into the project limits before it was <br /> stopped. The haul truck was guided back out along its path with the assistance of a spotter. The <br /> extents of the haul truck's path were surveyed and a buffer was added to cover approximately <br /> one and a half times the width of the haul truck. All geomembrane within this designated area <br /> was removed and replaced.The CQA Monitor observed both the removal of DCF from the surface <br /> and the exposure of geomembrane. As the geomembrane within the designated area was <br /> removed,the underlying SLF was inspected,tested, and re-approved prior to replacing with new <br /> geomembrane. All geomembrane installation within this area was documented and is included <br /> in Appendix J. The CQA Monitor then observed the replacement of DCF over the geomembrane. <br /> P:\Projects\Cert Report-Phase 2A Part 2\475.0106.032 CCV PHASE 2A Part 2 ROC REPORT.docx <br /> Page 6 <br />