Cripple Creek&Victor Gold Mining Company ®■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> September 30,2019 <br /> CAT D10 Dozer CAT 330 Excavator <br /> CAT 259 Skid steer CAT336 Excavator w/Roller Attachment <br /> CAT 279 Skid steer CAT 345 Excavator <br /> CAT IT28 Loader John Deere 470 Excavator <br /> CAT 966 Loader John Deere 35 Excavator <br /> CAT 988 Loader CAT 730 Haul Trucks <br /> John Deere 744k Loader Volvo A30 Haul Truck <br /> Komatsu PC78MR-6 CAT 740 Haul Trucks <br /> CAT CS56 Smooth Drum Compactor Edge TRT622 Trommel <br /> CAT CP56 Sheepsfoot Drum Compactor Tandem Axle Water Trucks <br /> CAT CS76 Smooth Drum Compactor Broce 350 Series Sweeper <br /> CAT 320 Excavator CAT 740 Water Truck <br /> CAT 329 Excavator CAT 773 Water Wagon <br /> 2.1. Clearing and Grubbing <br /> The footprint of the Phase 2A Part 2 Squaw Gulch VLF was stripped of all deleterious materials. <br /> Any soil containing vegetation was removed and placed in several site topsoil stockpiles <br /> designated by CC&V. All cleared areas were inspected by the CQA Monitor to ensure that all <br /> deleterious material was removed prior to further construction activities. <br /> 2.2. Site Grading <br /> Approximately 130,140 cy of Structural Fill (SF) material was used to grade the site within the <br /> limits of Squaw Gulch VLF Phase 2A. Prior to SF placement,the existing subgrade was scarified to <br /> a depth of 6 inches, moisture conditioned, and compacted, as required. The SF was then placed <br /> in 2-foot thick loose lifts, moisture conditioned as required, and compacted using a 12-ton <br /> vibratory sheepsfoot drum compactor. The entire surface of each lift was compacted with a <br /> minimum of four passes in accordance with the developed method specifications. The <br /> development of the method specifications is described in Appendix D. All subgrade preparation <br /> and SF placement associated with site grading was monitored by the CQA Monitor to ensure that <br /> it met the project Technical Specifications. <br /> 2.3. Subgrade Preparation <br /> The subgrade was prepared and inspected prior to SLF placement.The exposed subgrade surface <br /> was moisture conditioned and compacted using a 12-ton sheepsfoot drum vibratory compactor <br /> P.\Projects\Cert Report-Phase 2A Part 2\475.0106.032 CCV PHASE 2A Part 2 ROC REPORT docx <br /> Page 2 <br />