My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-30_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-09-30_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 4:50:27 AM
Creation date
10/8/2019 12:47:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/30/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400-2.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> August 25,2016 <br /> The MANAGER is also responsible for coordinating construction and CQA activities for the <br /> project. <br /> The MANAGER shall serve as communications coordinator for the project initiating <br /> preconstruction and resolution meetings. As communications coordinator, the MANAGER shall <br /> serve as a liaison between all parties involved in the project to ensure that ongoing <br /> communications are maintained. The MANAGER and CERTIFYING ENGINEER shall also be <br /> responsible for the resolution of all CQA issues that arise during the installation of the <br /> geosynthetics. <br /> Duties for this position include the following: <br /> ■ review and approval of design DRAWINGS and project SPECIFICATIONS for all <br /> geosynthetic components of the valley leach facility; <br /> ■ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor <br /> has performed similar reviews of the design DRAWINGS and project SPECIFICATIONS to <br /> ensure that the CQA Plan can be implemented; <br /> ■ coordination of all construction activities associated with the various CONTRACTOR(S); <br /> ■ scheduling and coordinating construction activities with required CQA testing and activities; <br /> ■ overseeing the construction quality control operations performed by the CONTRACTOR(S); <br /> ■ approve specific corrective measures to be implemented during construction when <br /> deviations from the SPECIFICATIONS occur; <br /> ■ ensure that required quality control testing has been performed in accordance with the <br /> CQA Plan and to the satisfaction of the CQA Monitor; and <br /> ■ ensure that the CQA personnel are provided with all documentation required in the CQA <br /> Plan and project SPECIFICATIONS. <br /> 2.3. Design Engineer <br /> In this CQA Plan the DESIGN ENGINEER and Engineer of Record (EOR) refers specifically to <br /> NewFields who has assumed the role of DESIGN ENGINEER after a thorough review of design <br /> documents to include, but not limited to, the DRAWINGS and SPECIFICATIONS. The DESIGN <br /> ENGINEER or the CERTIFYING ENGINEER identified in section 2.4 below, is responsible for <br /> approving all DRAWING and SPECIFICATION changes, modifications, or clarifications <br /> encountered during construction. <br /> 2.4. Certifying Engineer <br /> In this plan, CERTIFYING ENGINEER refers specifically to NewFields. CERTIFYING ENGINEER is <br /> the individual or firm responsible for certifying the construction was performed in compliance <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.