My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-30_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-09-30_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 4:50:27 AM
Creation date
10/8/2019 12:47:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/30/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine ■ <br /> Technical Specification No.01400.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> August 25,2016 <br /> between all parties involved in the project to ensure that ongoing communications are <br /> maintained. MANAGER and CERTIFYING ENGINEER shall be responsible for the resolution of all <br /> CQA issues. <br /> Duties for this position include the following: <br /> ■ review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the valley <br /> leach facility; <br /> ■ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br /> performed similar reviews of the DRAWINGS and SPECIFICATIONS to ensure that the CQA <br /> Plan can be implemented; <br /> ■ coordination of all construction activities associated with CONTRACTOR; <br /> ■ scheduling and coordinating construction activities with required CQA testing and activities; <br /> ■ overseeing the construction quality control operations performed by CONTRACTOR; <br /> ■ approve specific corrective measures to be implemented during construction when <br /> deviations from the SPECIFICATIONS occur; <br /> ■ ensure that required quality assurance testing has been performed in accordance with the <br /> CQA Plan and to the satisfaction of the CQA Monitor; and <br /> ■ ensure that the CQA personnel are provided with all documentation required in the CQA <br /> Plan and project SPECIFICATIONS. <br /> 2.3. Design Engineer <br /> In this CQA Plan the DESIGN ENGINEER and Engineer of Record (EOR) refers specifically to <br /> NewFields who has assumed the role of DESIGN ENGINEER after a thorough review of design <br /> documents to include, but not limited to, the DRAWINGS and SPECIFICATIONS. The DESIGN <br /> ENGINEER or the CERTIFYING ENGINEER identified in section 2.4 below, is responsible for <br /> approving all DRAWING and SPECIFICATION changes, modifications, or clarifications <br /> encountered during construction. <br /> 2.4. Certifying Engineer <br /> In this plan, CERTIFYING ENGINEER refers specifically to NewFields. CERTIFYING ENGINEER is <br /> the individual or firm responsible for certifying the construction was performed in compliance <br /> with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER shall be <br /> responsible for the resolution of all quality assurance issues. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.