My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_PERMIT FILE - C1981035 (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2019-09-18_PERMIT FILE - C1981035 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 9:09:43 AM
Creation date
10/8/2019 9:01:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2019
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No. 7 Page 38 of 123 <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />200.00 <br />0.00 5.00 <br />5.00 <br />2814 <br />0.097 <br />Return Time: 0.097 minutes <br />Total Truck Cycle Time: 2.540 minutes <br />Loading Tool unit <br />Production 494.19 <br />LCY/Hour Adjusted for job efficiency: <br />410.18 LCY/Hol <br />Truck Unit Production <br />269.47 <br />LCY/Hour Adjusted for job efficiency: <br />223.66 LCY/Hot <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 447.32 <br />LCY/Hour <br />Adjusted single truck/loader team production: 410.18 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 410.18 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 3.03 <br />Hours <br />Unit cost: $0.607 <br />/LCY Total job cost: $755 <br />
The URL can be used to link to this page
Your browser does not support the video tag.