Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 <br />TRUCK/LOADER TEAM WORK <br />Task description: King I - Haul topsoil to post -law refuse area <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 017 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />F.auinment Descrintion <br />Abbreviation: <br />Filename: <br />Shift basis: 1 per day <br />Page 36 of 123 <br />Total work team cost/hour: $248.95 <br />MATERIAL QUANTITIES <br />Initial volume: 871 CCY <br />Loose volume: 1,245 LCY <br />Source of estimated volume: 1.08 acres, 6" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.429 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.42 LCY <br />Truck Bed (volume) Basis: <br />Truck Loader Team -Truck: <br />-Loader: <br />Generic 10-12 c , 6x4 <br />CAT 938H <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />Cost Breakdown: <br />Truck/Loader Team <br />Support Equipment <br />Maintenance Equipment <br />Truck Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water True <br />%Utilization -machine: <br />100 100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 $21.63 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.40 $38.09 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA $0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 $37.13 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 $96.85 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $248.95 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $248.95 <br />MATERIAL QUANTITIES <br />Initial volume: 871 CCY <br />Loose volume: 1,245 LCY <br />Source of estimated volume: 1.08 acres, 6" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.429 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.42 LCY <br />Truck Bed (volume) Basis: <br />