Laserfiche WebLink
• Table of Contents <br />1. Scope and Purpose ------ ------------------- -------------------- ---------- --------- ---------- --------- 1 <br />2. Mine Drainage Plan ................................................................................... 1 <br />2.1 Diversion of Uncontaminated Runoff ................. ...................................... 1 <br />2.2 Treatment of Yard Runoff .. .................................................................... 2 <br />3. Drainage Basin Characteristics .................................................................... 3 <br />3.1 Basin Geometry and Soils ..................................................................... 3 <br />3.2 SCS Curve Number .............................................................................. 3 - <br /> <br />..... <br />4. HydrologY .................................................................... <br />5 <br />....................... <br />4.1 West Hillside Area ............................................... 5 <br />................................. <br />4.2 Peak Discharges and Volumes ............................................................... 6 <br />5. Drainage Structures ................................................. <br />. 6 <br />. <br />............................... <br />5 <br />1 Pipes and Channels <br />. <br />............................................................................. <br />5.2 Yard Drainage Routed to Ponds ... ..-,.,.-, <br />................................................. 6 <br />7 <br />5.3 Drainage Structure Summary ................................................................. 7 <br />5.4 Rip-rap Design for the Eastside Drainage Channel ................................... 9 ,i <br />• 8. Sediment Ponds .......... ............................................................................. 10 <br />6 <br />1 H <br />drolo <br />. <br />y <br />gy ...............................................................................:............ 10 <br />6.2 Watershed Sediment Yield <br />.................................................................... <br />12 <br />6.3 Pond Geometry .................................................................................... 13 <br />6.4 Outlet Works and Trash Rack <br />................................................................ <br />13 <br />7. Topsoil Storage Pile Drainage <br />.................................................................... <br />14 <br />• <br />January 1998 ~' <br />