My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_PERMIT FILE - C1981035 (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2019-09-18_PERMIT FILE - C1981035 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 7:49:57 AM
Creation date
10/8/2019 7:21:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2019
Doc Name
Structure Designs
Section_Exhibit Name
KI Appendix 10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
this junction to help transport flow to the yard (sediment ponds) and away from <br />the pile. See the design drawings for details. <br />In addition to the main, central drain it is recommended that French drains be <br />constructed on both sides at 100-foot intervals for the 800 ft of reaches 2 and 3. <br />These French drains should consist of 4" perforated pipe centered in a bedding <br />zone 24° x 24", trenched into the natural surface. The bedding should be a well <br />graded gravel with a maximum rock size of'/ ". The finger drains should extend <br />through the side of the underdrain filter liner and into the drain. Laterally they <br />should extend across the valley floor to the breakpoint in the slope with the valley <br />side walls. <br />If at anytime during salvaging of topsoil or any other construction activity, a <br />spring or seep is encountered, an additional lateral French drain shall be installed <br />from the seep to the underdrain. It shall be constructed as described above. <br />The underdrain is wrapped in a porous filter cloth (designed to allow water to <br />enter but keep out fne sediment) and filled with rock. No more than 10°/a of the <br />rock may be less than 12" in size and no single rock may be larger than 25% of <br />the depth of the drain. Flow from the drain will enter the lower intercept channel <br />and subsequently be diverted to the ponds for settling. <br /> <br /> <br />.lanuary 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.