Laserfiche WebLink
GCC Energy, LLC Colorado Department of Public Health and Environment <br />Permit No. 09LP0202F Air Pollution Control Division <br />Final Approval - Modification 1 <br />Annual Limits: <br />AIRS <br />Point <br />Tons per Year <br />Emission <br />Type <br />PM <br />PMI, <br />PM2.1 <br />001 <br />42.9 <br />16.0 <br />2.1 <br />Fugitive <br />002 <br />0.8 <br />0.4 <br />0.1 <br />Point <br />003 <br />0.5 <br />0.2 <br />0.0 <br />Point <br />004 <br />21.7 <br />10.3 <br />1.6 <br />Point <br />005 <br />1.5 <br />0.7 <br />0.1 <br />Point <br />010 <br />1.4 <br />0.5 <br />0.0 <br />Point <br />011 <br />2.3 <br />1.0 <br />0.1 <br />Fugitive <br />Point <br />25.9 <br />12.1 <br />1.8 <br />TOTAL <br />Fugitive <br />45.2 <br />17.0 <br />2.2 <br />Note: Compliance with the fugitive emission limits shall be demonstrated by not exceeding the <br />production limits in condition number 2 and by following the attached fugitive dust emissions <br />control plan. <br />See Attachment A" for information on emission factors and methods used to calculate limits for <br />Point Source emissions. <br />PROCESS LIMITATIONS AND RECORDS <br />2. This source shall be limited to the following maximum consumption, processing and /or <br />operational rates as listed below. Annual records of the actual process rate shall be maintained <br />by the applicant and made available to the Division for inspection upon request. (Reference: <br />Regulation 3, Part B, II.A.4) <br />Process /Consumption Limits <br />Process Parameter <br />Annual Limit <br />Mined coal production <br />1,300,000 <br />tons per year <br />Crushing and screening of coal <br />Finished product stockpiles <br />STATE AND FEDERAL REGULATORY REQUIREMENTS <br />3. Visible emissions shall not exceed twenty percent (20 %) opacity during normal operation of the <br />source. During periods of startup, process modification, or adjustment of control equipment <br />visible emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive <br />minutes. Opacity shall be determined using EPA Method 9. (Reference: Regulation No. 1, <br />Section II.A.1. & 4.) <br />4. This source is subject to the New Source Performance Standards requirements of Regulation No. <br />6, Part A, Subpart Y , Standards of Performance for Coal Preparation Plants including, but not <br />limited to, the following: <br />AIRS ID: 067/1103 Page 2 of 11 <br />