Laserfiche WebLink
North River Gravel Pit Weldon Construction <br /> 14. EXHIBIT M: Other Permits and Licenses <br /> The following permits are necessary for the full operation of the North River Gravel Pit: <br /> 1. CDPHE Discharge Permit- A stormwater plan and construction stormwater discharge <br /> permit will be needed for this operation. <br /> 2. A Spill Prevention Control and Countermeasure (SPCC) Plan will be needed at this site to <br /> cover the storage and transport of fuel and other liquids that are regulated by the EPA. <br /> 30 <br />