Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 26 of 26 <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 0.579 Minutes Adjusted for site altitude: 0.603 Minutes <br /> Truck Maneuver and Dump 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered, <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 400.00 15.00 3.00 18.00 600 0.670 <br /> 2 1000.00 1.00 3.00 4.00 2665 0.460 <br /> 3 500.00 10.00 3.00 13.00 834 -0.413 <br /> Haul Time: 0.717 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 500.00 -10.00 3.00 -7.00 2938 0.228 <br /> 2 1000.00 -1.00 3.00 2.00 2905 0.344 <br /> 3 400.00 -15.00 3.00 -12.00 1749 0.318 <br /> Return Time: 0.890 minutes <br /> Total Truck Cycle Time: 3.510 minutes <br /> Loading Tool unit <br /> Production 508.28 LCY/Hour Adjusted for job efficiency: 421.88 LCY/Hour <br /> Truck Unit Production <br /> 159.74 LCY/Hour Adjusted for job efficiency: 132.58 LCY/Hour <br /> Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 5 Truck(s) <br /> Adjusted hourly truck team production: 662.91 LCY/Hour <br /> Adjusted single truck/loader team production: 421.88 LCY/Hour <br /> Adjusted multiple truck/loader team production: 421.88 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 11.85 Hours <br /> Unit cost: $1.033 /LCY Total job cost: $59166 <br /> CIRCES Cost Estimating Software <br />