My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-07_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-10-07_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:00 PM
Creation date
10/7/2019 1:13:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/2019
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Clayton Wein
Type & Sequence
TR72
Email Name
CCW
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> Task description: Regrade RPA Topsoil Pile Footprints <br /> Site: Deserado Mine Permit Action: TR72 Permit/Job#: C 1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 10/7/2019 County: Moffat Filename: CO18-005 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $121.49 NA <br /> Operating Cost/Hour: $105.84 100 <br /> Ripper own. <br /> Cost/Hour: $13.94 NA <br /> Ripper op. Cost/Hour: $8.96 100 <br /> Operator Cost/Hour: $41.24 NA <br /> Total unit Cost/Hour: $291.46 <br /> Total Fleet Cost/Hour: $291.46 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 6,160 <br /> Swell factor: 1.125 <br /> Loose volume: 6,930 LCY <br /> Source of estimated volume: Section V and Map 162 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 1,243.2 LCY/hr <br /> production: <br /> Materials consistency Compacted fill or embankment 0.9 <br /> description: <br /> Average push -10% <br /> gradient: <br /> Average site altitude: 500 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Earth-Dry packed <br />
The URL can be used to link to this page
Your browser does not support the video tag.