Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: <br /> Site: Colowyo Coal Mine Permit Action: MR209 Permit/Job#: C 1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/3/2019 County: Moffat Filename: CO19-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Regrade Topsoil for 2.1 Acres adjacent to Topsoil DOZER 1 0.89 $509 <br /> Pile 15H <br /> 002 Reseed 2.1 Acres of Adjacent to Topsoil Pile 15H REVEGE 1 1.00 $2,563 <br /> SUBTOTALS: 1.89 $3,072 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $62 <br /> Performance bond: 1.05 Total= $32 <br /> Job superintendent: 0.95 Total= $66 <br /> Profit: 10.00 Total= $307 <br /> TOTAL O&P= $467 <br /> CONTRACT AMOUNT(direct+O&P)= $3,539 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $71 <br /> Reclamation management and/or administration: 1.91 $68 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $605 <br /> TOTAL BOND AMOUNT(direct+indirect)= $3,677 <br />