Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclaim Disturbance Addtn.North of Stoker Siding Pond <br /> Site: Colowyo Coal Mine Permit Action: MR208 Permit/Job#: C 1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/3/2019 County: Moffat Filename: CO19-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Form Fleet Task <br /> Task Description Used Size Hours Cost <br /> 001 Regrade Topsoil 0.2 Acre Addtn.Disturbance DOZER 1 0.26 $66 <br /> 002 Reseed 0.2 Acres of Addtn.Disturbance REVEGE 7 1 0.50 $244 <br /> SUBTOTALS: 0.76 $310 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $6 <br /> Performance bond: 1.05 Total= $3 <br /> Job superintendent: 0.38 Total= $26 <br /> Profit: 10.00 Total= $31 <br /> TOTAL O&P= $67 <br /> CONTRACT AMOUNT(direct+O&P)= $377 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $8 <br /> Reclamation management and/or administration: 1.91 $7 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $82 <br /> TOTAL BOND AMOUNT(direct+indirect)= $392 <br />