Laserfiche WebLink
Western Slope Flagstaff Quarry No.2 Corrective Action Plan <br /> The pipeline trench will be monitored and maintained to minimize settling and/or <br /> erosion control. <br /> Surface Grading <br /> Grade all areas disturbed by the pipeline and, lateral removal operations after <br /> completion of backfilling and compacting. Replace and repair any surface <br /> improvements damaged or removed. Grade all areas to match the existing ground <br /> lines. <br /> Reclamation: <br /> The disturbed areas associated with the removal of the water conveyance system <br /> in the permit areas will be reclaimed according to the original approved reclamation <br /> plan under Permit M-1996-076. <br />