Laserfiche WebLink
Kurt Blunt <br /> Page 2 of <br /> 10/2/2019 <br /> b. For Structure# ,the vertical and horizontal distances appear to be <br /> much smaller than indicated on Map 162. <br /> c. For structure4, the vertical distance in the table is 40 feet,but the <br /> map indicates that it should be between 20 and 25 feet. <br /> 14. In the introductory tent for Illustration 59,please provide more details regarding <br /> the SEDCAD model inputs. For example,what is the source for the particle size <br /> distribution? If this is the same as distributions used for other refuse piles at <br /> Deserado,can you explain the original source? <br /> 15. On page 4 of Illustration 60, the 1 o0-year flow into the pond sloes not match the <br /> value in the SEDCAD output(page 117). Please revise or explain. <br /> This concludes the Division's second adequacy review for the Deserado Nine's <br /> Technical Revision No. 72 Application. If you have any questions or concerns please <br /> feel free to contact nee at clayton.wein@state.co.us or(303)-866-3567 x8144. <br /> Sincerely, <br /> Clayton wein <br /> Environmental Protection Specialist <br />